Belkaid, FayçalMaliki, FouadBoudahri, FethiSari, Zaki2013-04-102013-04-102012doi:10.1007/978-3-642-31507-7_36https://dspace.univ-tlemcen.dz/handle/112/1733In this paper, we study a scheduling problem for minimizing the makespan on identical parallel machines with consumable resources in a node of a supply chain. The goal is to provide a first exact approach to this problem through the use of Branch and Bound method. We propose two new heuristics and apply other with a series of lower bounds that are incorporated into our algorithm. We tested a large number of randomly generated instances that allow us to compare the computation time and quality of lower bounds and heuristics.enSchedulingMakespanParallel MachinesBranch and BoundA Branch and Bound Algorithm to Minimize Makespan on Identical Parallel Machines with Consumable ResourcesArticle